Refining & petrochemical
FCCU reactors, regenerators, cyclones and transfer lines, hydrocrackers and sulphur recovery thermal reactors.
- FCCU
- Cyclones
- Hydrocrackers
- SRU
Refractory work on FCC units, hydrocrackers, boilers and thermal oxidisers, in the UK and abroad.

01 Industries
Refractory is needed wherever plant runs hot. Our installation, anchorage, inspection and consultancy work carries across all of these industries.
FCCU reactors, regenerators, cyclones and transfer lines, hydrocrackers and sulphur recovery thermal reactors.
Silicon-carbide tile systems on boiler water walls, biomass plant and waste heat boilers.
Brick and castable linings for rotary kilns, preheaters, coolers and lime kilns.
Installation, anchorage, repair and inspection of linings in furnaces and associated hot plant.
Linings for melting and holding furnaces and other high-temperature process equipment.
Brickwork, castable and insulation work on glass furnaces, regenerators and ancillary equipment.
Linings and insulation for kilns and dryers, including ceramic fibre systems.
Ceramic-fibre and castable linings for incinerators and thermal oxidisers, including partial relines.
Refractory-lined reactors, furnaces, boilers and sulphur plant.
Linings for lime kilns, recovery boilers and other fired equipment.
Linings and inspection for reformers, hydrogen units, transfer lines and waste heat boilers.
If it’s refractory-lined and runs hot, talk to us.
BeforeAfter
02 Case study · 2026
The lower ceramic-fibre lining had failed and a liquid sample from the unit measured pH 1. We cut back to sound lining and replaced only what had failed.




03 Selected clients
A selection of the operators, contractors and refractory specialists we've worked for.
| Client | Sites and scope | Years |
|---|---|---|
| LUKOIL-Nizhegorodnefteorgsintez (NORSI)Reference letter — view the redacted copy | Kstovo, Russia: simultaneous FCCU 1 & 2 turnaround (2018); reactor/regenerator inspection and repairs (2022); Stream 2 waste heat boiler inspection and repairs (2016). | 2016 – 2022 |
| ENI Sannazzaro refineryReference letter — view the redacted copy | Pavia, Italy: refractory and anchorage welding on FCCU turnarounds in 2018, 2020, 2021 and 2022, largely with Tecno Refractories, and further work in 2024. | 2018 – 2024 |
| Phillips 66 Humber Refinery | FCCU turnarounds: refractory subcontract for Calderys (2022); refractory inspection for Refractory Inspection Services Ltd (2024). | 2022, 2024 |
| Saras refineryPurchase order | Sarroch, Sardinia: anchorage welders for the regenerator refractory installation, for CRI Enerbility through SMR. | 2025 |
| Raffineria di MilazzoReference letter — view the redacted copy | Sicily, through SMR: FCCU turnaround inspection and supervision, a two-year inspection contract, and thermal reactor and unit inspections. | 2019 – 2024 |
| RHI MagnesitaAcceptance certificate — view the redacted copy | Main contractor for our LUKOIL NORSI FCCU turnaround work. | 2018 – 2022 |
| CalderysReference letter — view the redacted copy | LUKOIL Kstovo hydrocracker supervision and inspection (2021); Phillips 66 Humber FCCU turnaround (2022). | 2021 – 2022 |
| Lafarge | Moldova: complete brick reline of a rotary cement kiln. | 2021 |
| ADMPurchase order | Purfleet: waste heat boiler and standby boiler repairs and relining. Erith: thermal oxidiser partial reline. | 2016 – 2026 |
| TOTAL Lindsey Oil Refinery / Altrad–York LiningsReference letter — view the redacted copy | Lincolnshire: refractory welding on the FCC turnaround, which the client called a huge success. | 2019 |
| ZampellReference letter — view the redacted copy | Refractory and silicon-carbide tile work on boiler water walls at energy-from-waste plants, including Jersey, SUEZ Teesside and Riverside, Belvedere. | 2020 – 2023 |
| Tecno RefractoriesClient certificate — view the redacted copy | ENI Sannazzaro: FCCU lining replacement, anchorage welding, and hexmesh in new expansion bellows. | 2018 – 2023 |
| Pinnacle Power | Nottingham biomass plant: refractory removal and replacement. | 2017 – 2019 |
04 Project record
Recent work, newest first.
Neutralised and stripped out the failed lower ceramic-fibre lining, kept the sound fibre above, and relined the lower section with 1260-grade ceramic modules.
Purchase orderAnchorage welders for the regenerator refractory installation during the autumn turnaround, for CRI Enerbility through SMR.
Purchase orderRepeat refractory lining support for Refline.
Reference letter — view the redacted copyInspection and installation supervision on the 2019 FCCU turnaround and the 2021 shutdown, then a two-year inspection contract from 2022. Inspected a new thermal reactor at the OCS workshop in 2023, and reported on the hydrogen units, sulphur reactor and boilers in 2024.
Reference letter — view the redacted copyRefractory inspection for Refractory Inspection Services Ltd. Ron Ramsell was refractory inspector; Andrew Ramsell ran operations.
Independent inspection of delivered convection heater modules, covering the convection chambers, radiant coil connections and gas pipes, with expert reports, for Refraserv.
Defect inspection and refractory repairs, September–October 2022, as subcontractor to RHI Vostok Service. Completed to the required quality and on schedule.
Reference letter — view the redacted copySupervision, anchor layout, welding and installation of silicon-carbide tile protection for Zampell at Jersey, Coventry, Ipswich and Teesside.
Reference letter — view the redacted copyRefractory subcontract for Calderys. Ron Ramsell managed the project; Andrew Ramsell managed quality and contracts.
Supervision and inspection of the hydrocracker refractory scope for Calderys Italy, led by Andrew Ramsell.
Reference letter — view the redacted copyRefractory services for Altrad–York Linings, May–August 2019, which the client called a huge success.
Reference letter — view the redacted copyRefractory consultancy, installation, management and supervision on FCCU reactors, regenerators and associated equipment.
Reference letter — view the redacted copySupervision and management of the simultaneous turnaround of both FCC units, September–November 2018, for RHI Wostok Service. Andrew Ramsell issued the daily site reports.
Acceptance certificate — view the redacted copyRefractory lining replacement in the FCCU during the spring maintenance shutdown, for Tecno Refractories.
Client certificate — view the redacted copyRon Ramsell's welding team on two projects for FCC Specialist Associated Services, plus welding advice and work for Causeway Steel Products, finished on time.
Reference letter — view the redacted copy05 Testimonials
I am pleased to highly recommend RCSL and Mr. Ramsell for all refractory consultation and installation services. RCSL were able to deliver quality workmanship safely while conforming to all relevant industrial codes and standards including ASTM and API and material specifications.
Your company proved to be a professional experienced contractor and an effective organizer who fulfilled its contractual obligations and performed the works of the required quality within the scheduled deadlines. The distinctive characteristics of RCSL are flexibility, mobility in solving the assigned tasks, high competence of the employees as well as initiative and efficient response.
Mr Ramsell did a terrific job at site and was an asset to our project organisation. His communication skills, his work organization, and his positive personality in front of a big challenge ensure that the project was completed in a timely manner while keeping the good morale of the team.
06 From site
Anchorage, brickwork and lined equipment from our jobs. Select a photo to enlarge it.
Start a conversation
Tell us the equipment, the site and your dates. We'll tell you how we can help and who will do the work.